Wednesday, 17 June 2009

Denver Sluice gets a blow job

Interesting story about how Denver Sluice is getting air pumped into the water through a series of looped tubes to try to prevent silt building up. They have been having to remove 4m of silt each year. I had no idea it was as much as that.

No comments:

Post a Comment